Before energising, every connection is compared with the design; torques, cross-sections and labels are checked.
The panel is energised in the workshop; control circuits, drives and PLC / HMI scenarios are tested to the real sequence. The report is signed and shipped with the project.
After installation: energising, motor rotation, drive parameterisation and SCADA integration are verified; handover with operator training.
Busbar selection, cable cross-sections, colour codes, labelling and IP-class practices follow IEC standards, with one-to-one traceability to the EPLAN / ELCAD design.
Let's test your panel together in our workshop before shipping; contact us for scope.